End of day 2.

The stand pipe is complete.
The tank is in place with the pipe to the stand pipe and overflow connected  to it.
The o-ring through the plastic sheet at the dam wall has been fixed and all  we have to do  is wait until  the water runs clear before we fit the inflow pipe into  the tank.
 