|
||||||||||
A metal pipe is tied to the stake and an elbow is placed well below ground level and attached to the plastic pipe. A 'tee' piece is also fitted about 2m from the tap so that wash stand can be added later (if required). A trench is dug and the plastic pipe is burried. |
Please use the arrows to step though the pictures