A metal pipe is tied  to the stake and an elbow is placed well below ground level and attached to the plastic pipe. A 'tee' piece is also fitted about 2m from  the tap so that wash stand can  be added later (if required). A trench is dug and the plastic pipe is burried.

Please use  the arrows  to step though the pictures

Ekuthuleni Water Project

114th_Fife_Home_orange