e-construction

The company that put in our RSJ to support the roof, Cut the hole for the new corridor door and built the stud walls

20180908_150933
s18_0379

The roof is supported, a lot of the wall is down, the RSJ (beam) is in place ready for lifting and the workers stopped for 2 minutes to pose for this photograph!

20180908_151000
20180909_154912

Before (above) and after with the beam fitted (below)

s18_0382

picture showing new stud wall
(plywood covered)

s18_0383
s18_0387
s18_0389

The stud wall from the corridor side

20180909_155044
s18_0386

The new doorway
also showing the stud wall (frame) for the office (right hand picture)

20180909_160229_001
20180913_112818

The beam and end support are boxed in.

September 2018

114th_Fife_Home_orange