The company that put in our RSJ to support the roof, Cut the hole for the new corridor door and built the stud walls
The roof is supported, a lot of the wall is down, the RSJ (beam) is in place ready for lifting and the workers stopped for 2 minutes to pose for this photograph!
Before (above) and after with the beam fitted (below)
picture showing new stud wall
(plywood covered)
The stud wall from the corridor side
The new doorway
also showing the stud wall (frame) for the office (right hand picture)
The beam and end support are boxed in.